Home Building 101

Our first home building adventure.

Tahanan Time Line

All about the land

Land auction (28-Mar-2009)
Land Settlement (11-May-2009)
Land Title Transferred (25-June-2009)

Construction
Free quotation / Initial Tender
Security Payment
1st Draft of Drawing
2nd Draft of Drawing
Hydraulic Plan
Colour Selection
Final Drawing for Approval
Revision Requested by Certifier
Revised Drawing
Approved Plans via private certifier (24-March-2010)
Final Contract Review / Signing (21-April-2010)
Tree Removal (1-May-2010)
Submission of Letter to Commence Construction (9-May-2010)
Drawings Revision Required (22-29 May 2010)
Rev2 drawings sent to the Private Certifier (24-June-2010)
2nd revision of the plan approved by Private Certifier (30-June-2010)
Day 1 - Construction (11-June-2010 ??, within 28 days) - 12-July-2010
Piering - 28-July-2010
Slab - 16-August-2010
Frame - 23-Sept-2010
Brickwork - 10-Nov-2010
Roof Tiles - 12-Nov-2010
Lock Up - 16-Feb-2011
Fixing Out -4-March-2011
Painting - 8-April-2011
Final Inspection 13-April-2011
Completion -
Handover -
Move-in -

Sunday, May 30, 2010

May 22-29 was a wet week

Two weeks ago, someone working on excavation called me to check the block of land.  Unfortunately, the rains started to pour down the whole week.  So when Monday came, I thought.. one week lost.  :(

Some changes had to be done on the block of land.  Since our block was higher on the front of the block and for some unfortunate thing, the sewer line runs at the top of the block... so the builder contacted us about an issue.  We were a bit alarmed since they said that the president (PR) wanted to talk to us about some issues in the building.

Since our house plan is split level, with the rear part being lower (about 4 steps), they had to raise it so we won't have an issue with the sewer.  So we were given a few options:
1.   Put in a tank and a pump - costly option, needs council approval, high maintenance cost.
2.   Have an additional split, from the front of the house, split it by 2 steps, then another 2 steps to the rear.  - ending up with 3 levels.  So there will be a 2 steps going to the rumpus and the corridor to Bed 3 and 4.
3.   Raise the rear of the house so we end up with 2 levels and the steps is reduced to 2 steps instead of the original 4 steps.  - the trade off is we will have a bulkhead at the rear wall, impacting the windows.

So we decided on option 3, which is the cheapest option so far.  bulkhead may be the only difference... but i hope our decision is the best one. :)

Impact is that they need to redraw the slab and structural design.  maybe 1-2 weeks off the schedule.

Only good thing this week - the security fence has been put up already.  :)  slowly getting there.  