Our first home building adventure.

Tahanan Time Line

All about the land

Land auction (28-Mar-2009)
Land Settlement (11-May-2009)
Land Title Transferred (25-June-2009)

Construction
Free quotation / Initial Tender
Security Payment
1st Draft of Drawing
2nd Draft of Drawing
Hydraulic Plan
Colour Selection
Final Drawing for Approval
Revision Requested by Certifier
Revised Drawing
Approved Plans via private certifier (24-March-2010)
Final Contract Review / Signing (21-April-2010)
Tree Removal (1-May-2010)
Submission of Letter to Commence Construction (9-May-2010)
Drawings Revision Required (22-29 May 2010)
Rev2 drawings sent to the Private Certifier (24-June-2010)
2nd revision of the plan approved by Private Certifier (30-June-2010)
Day 1 - Construction (11-June-2010 ??, within 28 days) - 12-July-2010
Piering - 28-July-2010
Slab - 16-August-2010
Frame - 23-Sept-2010
Brickwork - 10-Nov-2010
Roof Tiles - 12-Nov-2010
Lock Up - 16-Feb-2011
Fixing Out -4-March-2011
Painting - 8-April-2011
Final Inspection 13-April-2011
Completion -
Handover -
Move-in -

Friday, May 14, 2010

External Colors

I got this photo from the Austral website which shows the bricks we chose for our house.  It also more or less use the same shade of red we chose for the roof tiles.  Without the second level, this is the external colour that we chose including the fascia and gutters.  Hopefully everything turns out well.

This is a sample of how the color combination we thought of.  The design is quite different but color of the roof and brick should be close.  I think the roof tiles is on the darker side though.  Check out the sample below from the website of Bristile Roofing.




Bricks:  Austral Moccasin







Roof Tiles:  Bristile Redwood












The image below is how the house will look like - front view.  With the actual dimensions.